Explore citations and references

Citations

Entries Referencing This

  • 74 FR 23254: Enhancements to Emergency Preparedness Regulations (05/18/2009)
    Full Title:
    Enhancements to Emergency Preparedness Regulations
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, May 18, 2009
    Type:
    Proposed Rule
  • 74 FR 30067: Mandatory Reliability Standards for Critical Infrastructure Protection (06/24/2009)
    Full Title:
    Mandatory Reliability Standards for Critical Infrastructure Protection
    Agency:
    Department of Energy
    Date Entered:
    Wednesday, June 24, 2009
    Type:
    Notice
  • 74 FR 40006: Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements (08/10/2009)
    Full Title:
    Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, August 10, 2009
    Type:
    Proposed Rule
  • 75 FR 3761: Southern Nuclear Operating Company, Inc., Edwin I. Hatch Nuclear Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact (01/22/2010)
    Full Title:
    Southern Nuclear Operating Company, Inc., Edwin I. Hatch Nuclear Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, January 22, 2010
    Type:
    Notice
  • 75 FR 3761: Southern Nuclear Operating Company, Inc., Edwin I. Hatch Nuclear Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact (01/22/2010)
    Full Title:
    Southern Nuclear Operating Company, Inc., Edwin I. Hatch Nuclear Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, January 22, 2010
    Type:
    Notice
  • 75 FR 3762: Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact (01/22/2010)
    Full Title:
    Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, January 22, 2010
    Type:
    Notice
  • 75 FR 3762: Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact (01/22/2010)
    Full Title:
    Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, January 22, 2010
    Type:
    Notice
  • 75 FR 3762: Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact (01/22/2010)
    Full Title:
    Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, January 22, 2010
    Type:
    Notice
  • 75 FR 4591: Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2; Environmental Assessment and Finding of No Significant Impact (01/28/2010)
    Full Title:
    Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, January 28, 2010
    Type:
    Notice
  • 75 FR 4591: Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2; Environmental Assessment and Finding of No Significant Impact (01/28/2010)
    Full Title:
    Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, January 28, 2010
    Type:
    Notice
  • 75 FR 5354: Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3 Environmental Assessment and Finding of No Significant Impact (02/02/2010)
    Full Title:
    Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3 Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, February 02, 2010
    Type:
    Notice
  • 75 FR 5354: Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3 Environmental Assessment and Finding of No Significant Impact (02/02/2010)
    Full Title:
    Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3 Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, February 02, 2010
    Type:
    Notice
  • 75 FR 5631: Wolf Creek Nuclear Operating Corporation, Wolf Creek Generating Station; Environmental Assessment and Finding of No Significant Impact (02/03/2010)
    Full Title:
    Wolf Creek Nuclear Operating Corporation, Wolf Creek Generating Station; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, February 03, 2010
    Type:
    Notice
  • 75 FR 5631: Wolf Creek Nuclear Operating Corporation, Wolf Creek Generating Station; Environmental Assessment and Finding of No Significant Impact (02/03/2010)
    Full Title:
    Wolf Creek Nuclear Operating Corporation, Wolf Creek Generating Station; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, February 03, 2010
    Type:
    Notice
  • 75 FR 6223: PSEG Nuclear LLC; Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Environmental Assessment and Finding of No Significant Impact (02/08/2010)
    Full Title:
    PSEG Nuclear LLC; Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, February 08, 2010
    Type:
    Notice
  • 75 FR 6224: Northern States Power Company of Minnesota; Monticello Nuclear Generating Plant Environmental Assessment and Finding of No Significant Impact (02/08/2010)
    Full Title:
    Northern States Power Company of Minnesota; Monticello Nuclear Generating Plant Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, February 08, 2010
    Type:
    Notice
  • 75 FR 6224: Northern States Power Company of Minnesota; Monticello Nuclear Generating Plant Environmental Assessment and Finding of No Significant Impact (02/08/2010)
    Full Title:
    Northern States Power Company of Minnesota; Monticello Nuclear Generating Plant Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, February 08, 2010
    Type:
    Notice
  • 75 FR 6225: Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant Units 1 and 2; Environmental Assessment and Finding of No Significant Impact (02/08/2010)
    Full Title:
    Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant Units 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, February 08, 2010
    Type:
    Notice
  • 75 FR 6225: Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant Units 1 and 2; Environmental Assessment and Finding of No Significant Impact (02/08/2010)
    Full Title:
    Northern States Power Company-Minnesota; Prairie Island Nuclear Generating Plant Units 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, February 08, 2010
    Type:
    Notice
  • 75 FR 6413: Office of New Reactors; Proposed Revision to Standard Review Plan, Section 14.3.12 on Physical Security Hardware Inspections, Tests, Analyses, and Acceptance Criteria (02/09/2010)
    Full Title:
    Office of New Reactors; Proposed Revision to Standard Review Plan, Section 14.3.12 on Physical Security Hardware Inspections, Tests, Analyses, and Acceptance Criteria
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, February 09, 2010
    Type:
    Notice
  • 75 FR 6736: FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation Corp., Ohio Edison Company, the Toledo Edison Company, Beaver Valley Power Station, Unit Nos. 1 and 2; Environmental Assessment and Finding of No Significant Impact (02/10/2010)
    Full Title:
    FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation Corp., Ohio Edison Company, the Toledo Edison Company, Beaver Valley Power Station, Unit Nos. 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, February 10, 2010
    Type:
    Notice
  • 75 FR 6736: FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation Corp., Ohio Edison Company, the Toledo Edison Company, Beaver Valley Power Station, Unit Nos. 1 and 2; Environmental Assessment and Finding of No Significant Impact (02/10/2010)
    Full Title:
    FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation Corp., Ohio Edison Company, the Toledo Edison Company, Beaver Valley Power Station, Unit Nos. 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, February 10, 2010
    Type:
    Notice
  • 75 FR 8150: STP Nuclear Operating Company (02/23/2010)
    Full Title:
    STP Nuclear Operating Company
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, February 23, 2010
    Type:
    Notice
  • 75 FR 8152: Pacific Gas and Electric Company; Diablo Canyon Power Plant Environmental Assessment and Finding of No Significant Impact (02/23/2010)
    Full Title:
    Pacific Gas and Electric Company; Diablo Canyon Power Plant Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, February 23, 2010
    Type:
    Notice
  • 75 FR 8153: Nebraska Public Power District; Cooper Nuclear Station Environmental Assessment and Finding of No Significant Impact (02/23/2010)
    Full Title:
    Nebraska Public Power District; Cooper Nuclear Station Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, February 23, 2010
    Type:
    Notice
  • 75 FR 8410: Carolina Power & Light Company: H. B. Robinson Steam Electric Plant, Unit No. 2; Environmental Assessment and Finding of No Significant Impact (02/24/2010)
    Full Title:
    Carolina Power & Light Company: H. B. Robinson Steam Electric Plant, Unit No. 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, February 24, 2010
    Type:
    Notice
  • 75 FR 8753: Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact (02/25/2010)
    Full Title:
    Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, February 25, 2010
    Type:
    Notice
  • 75 FR 8753: Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact (02/25/2010)
    Full Title:
    Carolina Power & Light Company, Brunswick Steam Electric Plant, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, February 25, 2010
    Type:
    Notice
  • 75 FR 8756: South Carolina Electric and Gas Company, Virgil C. Summer Nuclear Station, Unit 1; Environmental Assessment and Finding of No Significant Impact (02/25/2010)
    Full Title:
    South Carolina Electric and Gas Company, Virgil C. Summer Nuclear Station, Unit 1; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, February 25, 2010
    Type:
    Notice
  • 75 FR 8756: South Carolina Electric and Gas Company, Virgil C. Summer Nuclear Station, Unit 1; Environmental Assessment and Finding of No Significant Impact (02/25/2010)
    Full Title:
    South Carolina Electric and Gas Company, Virgil C. Summer Nuclear Station, Unit 1; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, February 25, 2010
    Type:
    Notice
  • 75 FR 11205: Entergy Nuclear Operations, Inc; Pilgrim Nuclear Power Station Environmental Assessment and Finding of No Significant Impact (03/10/2010)
    Full Title:
    Entergy Nuclear Operations, Inc; Pilgrim Nuclear Power Station Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, March 10, 2010
    Type:
    Notice
  • 75 FR 11205: Entergy Nuclear Operations, Inc; Pilgrim Nuclear Power Station Environmental Assessment and Finding of No Significant Impact (03/10/2010)
    Full Title:
    Entergy Nuclear Operations, Inc; Pilgrim Nuclear Power Station Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, March 10, 2010
    Type:
    Notice
  • 75 FR 9618: Virginia Electric and Power Company Surry Power Station, Unit Nos. 1 and 2 Environmental Assessment and Finding of No Significant Impact (03/03/2010)
    Full Title:
    Virginia Electric and Power Company Surry Power Station, Unit Nos. 1 and 2 Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, March 03, 2010
    Type:
    Notice
  • 75 FR 9618: Virginia Electric and Power Company Surry Power Station, Unit Nos. 1 and 2 Environmental Assessment and Finding of No Significant Impact (03/03/2010)
    Full Title:
    Virginia Electric and Power Company Surry Power Station, Unit Nos. 1 and 2 Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, March 03, 2010
    Type:
    Notice
  • 75 FR 9955: Entergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1; Environmental Assessment and Finding of No Significant Impact (03/04/2010)
    Full Title:
    Entergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, March 04, 2010
    Type:
    Notice
  • 75 FR 9956: PSEG Nuclear LLC, Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Exemption (03/04/2010)
    Full Title:
    PSEG Nuclear LLC, Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, March 04, 2010
    Type:
    Notice
  • 75 FR 10834: Energy Northwest; Columbia Generating Station; Environmental Assessment and Finding of No Significant Impact (03/09/2010)
    Full Title:
    Energy Northwest; Columbia Generating Station; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, March 09, 2010
    Type:
    Notice
  • 75 FR 10835: Omaha Public Power District, Fort Calhoun Station, Unit 1, Environmental Assessment and Finding of No Significant Impact (03/09/2010)
    Full Title:
    Omaha Public Power District, Fort Calhoun Station, Unit 1, Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, March 09, 2010
    Type:
    Notice
  • 75 FR 11946: Detroit Edison Company; FERMI 2; Environmental Assessment and Finding of No Significant Impact (03/12/2010)
    Full Title:
    Detroit Edison Company; FERMI 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 12, 2010
    Type:
    Notice
  • 75 FR 11946: Detroit Edison Company; FERMI 2; Environmental Assessment and Finding of No Significant Impact (03/12/2010)
    Full Title:
    Detroit Edison Company; FERMI 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 12, 2010
    Type:
    Notice
  • 75 FR 12311: Entergy Nuclear Operations, Inc; Vermont Yankee Nuclear Power Station Environmental Assessment and Finding of No Significant Impact (03/15/2010)
    Full Title:
    Entergy Nuclear Operations, Inc; Vermont Yankee Nuclear Power Station Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, March 15, 2010
    Type:
    Notice
  • 75 FR 12311: Entergy Nuclear Operations, Inc; Vermont Yankee Nuclear Power Station Environmental Assessment and Finding of No Significant Impact (03/15/2010)
    Full Title:
    Entergy Nuclear Operations, Inc; Vermont Yankee Nuclear Power Station Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, March 15, 2010
    Type:
    Notice
  • 75 FR 12314: Tennessee Valley Authority: Watts Bar Nuclear Plant, Units 1 and 2 Exemption (03/15/2010)
    Full Title:
    Tennessee Valley Authority: Watts Bar Nuclear Plant, Units 1 and 2 Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, March 15, 2010
    Type:
    Notice
  • 75 FR 12580: Southern California Edison Company, San Onofre Nuclear Generating Station, Units 2 and 3; Environmental Assessment and Finding of No Significant Impact (03/16/2010)
    Full Title:
    Southern California Edison Company, San Onofre Nuclear Generating Station, Units 2 and 3; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, March 16, 2010
    Type:
    Notice
  • 75 FR 13319: NextEra Energy Seabrook, LLC, et al. (03/19/2010)
    Full Title:
    NextEra Energy Seabrook, LLC, et al.
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 19, 2010
    Type:
    Notice
  • 75 FR 13319: NextEra Energy Seabrook, LLC, et al. (03/19/2010)
    Full Title:
    NextEra Energy Seabrook, LLC, et al.
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 19, 2010
    Type:
    Notice
  • 75 FR 13320: Florida Power Corporation, et al., Crystal River Unit 3 Nuclear Generating Plant; Environmental Assessment and Finding of No Significant Impact (03/19/2010)
    Full Title:
    Florida Power Corporation, et al., Crystal River Unit 3 Nuclear Generating Plant; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 19, 2010
    Type:
    Notice
  • 75 FR 13320: Florida Power Corporation, et al., Crystal River Unit 3 Nuclear Generating Plant; Environmental Assessment and Finding of No Significant Impact (03/19/2010)
    Full Title:
    Florida Power Corporation, et al., Crystal River Unit 3 Nuclear Generating Plant; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 19, 2010
    Type:
    Notice
  • 75 FR 13322: PPL Susquehanna, LLC.: Susquehanna Steam Electric Station, Units 1 and 2 Environmental Assessment and Finding of No Significant Impact (03/19/2010)
    Full Title:
    PPL Susquehanna, LLC.: Susquehanna Steam Electric Station, Units 1 and 2 Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 19, 2010
    Type:
    Notice
  • 75 FR 13322: PPL Susquehanna, LLC.: Susquehanna Steam Electric Station, Units 1 and 2 Environmental Assessment and Finding of No Significant Impact (03/19/2010)
    Full Title:
    PPL Susquehanna, LLC.: Susquehanna Steam Electric Station, Units 1 and 2 Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 19, 2010
    Type:
    Notice
  • 75 FR 13327: Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Exemption (03/19/2010)
    Full Title:
    Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 19, 2010
    Type:
    Notice
  • 75 FR 13606: Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Environmental Assessment and Finding of No Significant Impact (03/22/2010)
    Full Title:
    Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, March 22, 2010
    Type:
    Notice
  • 75 FR 13607: Entergy Operations, Inc., Arkansas Nuclear One, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact (03/22/2010)
    Full Title:
    Entergy Operations, Inc., Arkansas Nuclear One, Units 1 and 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, March 22, 2010
    Type:
    Notice
  • 75 FR 13609: Tennessee Valley Authority Sequoyah Nuclear Plant, Units 1 and 2 Exemption (03/22/2010)
    Full Title:
    Tennessee Valley Authority Sequoyah Nuclear Plant, Units 1 and 2 Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, March 22, 2010
    Type:
    Notice
  • 75 FR 13798: Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3 Environmental Assessment and Finding of No Significant Impact (03/23/2010)
    Full Title:
    Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3 Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, March 23, 2010
    Type:
    Notice
  • 75 FR 14473: Entergy Nuclear Operations, Inc., Palisades Nuclear Plant; Environmental Assessment and Finding of No Significant Impact (03/25/2010)
    Full Title:
    Entergy Nuclear Operations, Inc., Palisades Nuclear Plant; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, March 25, 2010
    Type:
    Notice
  • 75 FR 14634: Dominion Nuclear Connecticut, Inc.; Millstone Power Station, Unit Nos. 1, 2, and 3; Environmental Assessment and Finding of No Significant Impact (03/26/2010)
    Full Title:
    Dominion Nuclear Connecticut, Inc.; Millstone Power Station, Unit Nos. 1, 2, and 3; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 26, 2010
    Type:
    Notice
  • 75 FR 14635: FirstEnergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Environmental Assessment and Finding of No Significant Impact (03/26/2010)
    Full Title:
    FirstEnergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 26, 2010
    Type:
    Notice
  • 75 FR 14635: FirstEnergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Environmental Assessment and Finding of No Significant Impact (03/26/2010)
    Full Title:
    FirstEnergy Nuclear Operating Company, Davis-Besse Nuclear Power Station; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 26, 2010
    Type:
    Notice
  • 75 FR 14637: James A. FitzPatrick Nuclear Power Plant; Environmental Assessment and Finding of No Significant Impact (03/26/2010)
    Full Title:
    James A. FitzPatrick Nuclear Power Plant; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 26, 2010
    Type:
    Notice
  • 75 FR 14638: FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and Finding of No Significant Impact (03/26/2010)
    Full Title:
    FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 26, 2010
    Type:
    Notice
  • 75 FR 14638: FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and Finding of No Significant Impact (03/26/2010)
    Full Title:
    FirstEnergy Nuclear Operating Company; Perry Nuclear Power Plant; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 26, 2010
    Type:
    Notice
  • 75 FR 14639: Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 1, 2, and 3; Environmental Assessment and Finding of No Significant Impact (03/26/2010)
    Full Title:
    Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 1, 2, and 3; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 26, 2010
    Type:
    Notice
  • 75 FR 14640: Energy Northwest Columbia Generating Station; Exemption (03/26/2010)
    Full Title:
    Energy Northwest Columbia Generating Station; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, March 26, 2010
    Type:
    Notice
  • 75 FR 15745: Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Exemption (03/30/2010)
    Full Title:
    Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, March 30, 2010
    Type:
    Notice
  • 75 FR 15749: Entergy Operations, Inc., Grand Gulf Nuclear Station, Unit 1; Exemption (03/30/2010)
    Full Title:
    Entergy Operations, Inc., Grand Gulf Nuclear Station, Unit 1; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, March 30, 2010
    Type:
    Notice
  • 75 FR 15751: Entergy Operations, Inc., Arkansas Nuclear One, Units 1 And 2; Exemption (03/30/2010)
    Full Title:
    Entergy Operations, Inc., Arkansas Nuclear One, Units 1 And 2; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, March 30, 2010
    Type:
    Notice
  • 75 FR 16517: Dominion Nuclear Connecticut, Inc.; Millstone Power Station, Unit Nos 1, 2, and 3; Exemption (04/01/2010)
    Full Title:
    Dominion Nuclear Connecticut, Inc.; Millstone Power Station, Unit Nos 1, 2, and 3; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, April 01, 2010
    Type:
    Notice
  • 75 FR 16518: Florida Power Corporation, et al.; Crystal River Unit 3 Nuclear Generating Plant; Exemption (04/01/2010)
    Full Title:
    Florida Power Corporation, et al.; Crystal River Unit 3 Nuclear Generating Plant; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, April 01, 2010
    Type:
    Notice
  • 75 FR 36125: Office of New Reactors; Proposed Revision to Standard Review Plan, Section 13.6.2, Revision 1 on Physical Security-Design Certification (06/24/2010)
    Full Title:
    Office of New Reactors; Proposed Revision to Standard Review Plan, Section 13.6.2, Revision 1 on Physical Security-Design Certification
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, June 24, 2010
    Type:
    Notice
  • 75 FR 36126: Office of New Reactors; Proposed Revision to Standard Review Plan Section 13.6.3, Revision 1 on Physical Security-Early Site Permit (06/24/2010)
    Full Title:
    Office of New Reactors; Proposed Revision to Standard Review Plan Section 13.6.3, Revision 1 on Physical Security-Early Site Permit
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, June 24, 2010
    Type:
    Notice
  • 75 FR 36126: Office of New Reactors; Proposed Revision to Standard Review Plan Section 13.6.1, Revision 1 on Physical Security-Combined License and Operating Reactors (06/24/2010)
    Full Title:
    Office of New Reactors; Proposed Revision to Standard Review Plan Section 13.6.1, Revision 1 on Physical Security-Combined License and Operating Reactors
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, June 24, 2010
    Type:
    Notice
  • 75 FR 62592: Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information (10/12/2010)
    Full Title:
    Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, October 12, 2010
    Type:
    Notice
  • 75 FR 68831: Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information (11/09/2010)
    Full Title:
    Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information
    Date Entered:
    Tuesday, November 09, 2010
    Type:
    Notice
  • 75 FR 71152: Southern California Edison; San Onofre Nuclear Generating Station, Unit 2 and Unit 3; Exemption (11/22/2010)
    Full Title:
    Southern California Edison; San Onofre Nuclear Generating Station, Unit 2 and Unit 3; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, November 22, 2010
    Type:
    Notice
  • 75 FR 76041: Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information (12/07/2010)
    Full Title:
    Notice; Applications and Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, December 07, 2010
    Type:
    Notice
  • 75 FR 77919: Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental Assessment and Finding of No Significant Impact (12/14/2010)
    Full Title:
    Carolina Power & Light Company Shearon Harris Nuclear Power Plant, Unit 1; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, December 14, 2010
    Type:
    Notice
  • 75 FR 80545: Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental Assessment and Finding of No Significant Impact (12/22/2010)
    Full Title:
    Carolina Power & Light Company; H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental Assessment and Finding of No Significant Impact
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, December 22, 2010
    Type:
    Notice
  • 75 FR 80547: Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption (12/22/2010)
    Full Title:
    Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, December 22, 2010
    Type:
    Notice
  • 75 FR 81037: Waste Confidence Decision Update (12/23/2010)
    Full Title:
    Waste Confidence Decision Update
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, December 23, 2010
    Type:
    Rule
  • 75 FR 82414: Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption (12/30/2010)
    Full Title:
    Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, December 30, 2010
    Type:
    Notice
  • 76 FR 187: Programmatic Environmental Assessment and Final Finding of No Significant Impact for Exemptions From the Implementation Deadline for New Security Requirements (01/03/2011)
    Full Title:
    Programmatic Environmental Assessment and Final Finding of No Significant Impact for Exemptions From the Implementation Deadline for New Security Requirements
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, January 03, 2011
    Type:
    Notice
  • 76 FR 6200: Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (02/03/2011)
    Full Title:
    Enhanced Weapons, Firearms Background Checks, and Security Event Notifications
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, February 03, 2011
    Type:
    Proposed Rule
  • 76 FR 8872: License and Certificate of Compliance Terms (02/16/2011)
    Full Title:
    License and Certificate of Compliance Terms
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, February 16, 2011
    Type:
    Rule
  • 76 FR 8872: License and Certificate of Compliance Terms (02/16/2011)
    Full Title:
    License and Certificate of Compliance Terms
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, February 16, 2011
    Type:
    Rule
  • 76 FR 30204: Exelon Nuclear, Dresden Nuclear Power Station, Unit 1; Exemption From Certain Security Requirements (05/24/2011)
    Full Title:
    Exelon Nuclear, Dresden Nuclear Power Station, Unit 1; Exemption From Certain Security Requirements
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, May 24, 2011
    Type:
    Notice
  • 76 FR 32238: Detroit Edison Company, Fermi 2; Exemption (06/03/2011)
    Full Title:
    Detroit Edison Company, Fermi 2; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, June 03, 2011
    Type:
    Notice
  • 76 FR 48908: Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations (08/09/2011)
    Full Title:
    Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, August 09, 2011
    Type:
    Notice
  • 76 FR 52699: Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations (08/23/2011)
    Full Title:
    Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, August 23, 2011
    Type:
    Notice
  • 76 FR 55125: Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations (09/06/2011)
    Full Title:
    Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, September 06, 2011
    Type:
    Notice
  • 76 FR 63671: Omaha Public Power District, Fort Calhoun Station, Unit 1; Exemption (10/13/2011)
    Full Title:
    Omaha Public Power District, Fort Calhoun Station, Unit 1; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Thursday, October 13, 2011
    Type:
    Notice
  • 76 FR 65541: Environmental Assessment and Finding of No Significant Impact Related to Exemption From Certain Requirements for the Zion Nuclear Power Station, Units 1 and 2, License DPR-039 and DPR-048, Lake County, IL (10/21/2011)
    Full Title:
    Environmental Assessment and Finding of No Significant Impact Related to Exemption From Certain Requirements for the Zion Nuclear Power Station, Units 1 and 2, License DPR-039 and DPR-048, Lake County, IL
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, October 21, 2011
    Type:
    Notice
  • 76 FR 65542: N.S. Savannah; Exemption From Certain Security Requirements (10/21/2011)
    Full Title:
    N.S. Savannah; Exemption From Certain Security Requirements
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Friday, October 21, 2011
    Type:
    Notice
  • 76 FR 72560: Enhancements to Emergency Preparedness Regulations (11/23/2011)
    Full Title:
    Enhancements to Emergency Preparedness Regulations
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, November 23, 2011
    Type:
    Rule
  • 77 FR 16175: Station Blackout (03/20/2012)
    Full Title:
    Station Blackout
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, March 20, 2012
    Type:
    Proposed Rule
  • 77 FR 23161: Onsite Emergency Response Capabilities (04/18/2012)
    Full Title:
    Onsite Emergency Response Capabilities
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, April 18, 2012
    Type:
    Proposed Rule
  • 77 FR 27097: LaCrosse Boiling Water Reactor, Exemption From Certain Requirements, Vernon County, WI (05/08/2012)
    Full Title:
    LaCrosse Boiling Water Reactor, Exemption From Certain Requirements, Vernon County, WI
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, May 08, 2012
    Type:
    Notice
  • 77 FR 33005: Connecticut Yankee Atomic Power Company; Haddam Neck Independent Spent Fuel Storage Installation, Staff Evaluation; Exemption (06/04/2012)
    Full Title:
    Connecticut Yankee Atomic Power Company; Haddam Neck Independent Spent Fuel Storage Installation, Staff Evaluation; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, June 04, 2012
    Type:
    Notice
  • 77 FR 33005: Connecticut Yankee Atomic Power Company; Haddam Neck Independent Spent Fuel Storage Installation, Staff Evaluation; Exemption (06/04/2012)
    Full Title:
    Connecticut Yankee Atomic Power Company; Haddam Neck Independent Spent Fuel Storage Installation, Staff Evaluation; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Monday, June 04, 2012
    Type:
    Notice
  • 77 FR 38338: Dairyland Power Cooperative; La Crosse Boiling Water Reactor Exemption From Certain Security Requirements (06/27/2012)
    Full Title:
    Dairyland Power Cooperative; La Crosse Boiling Water Reactor Exemption From Certain Security Requirements
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, June 27, 2012
    Type:
    Notice
  • 77 FR 38339: Dairyland Power Cooperative, La Crosse Boiling Water Reactor Exemption From Certain Security Requirements (06/27/2012)
    Full Title:
    Dairyland Power Cooperative, La Crosse Boiling Water Reactor Exemption From Certain Security Requirements
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, June 27, 2012
    Type:
    Notice
  • 77 FR 48565: Maine Yankee Atomic Power Company, Maine Yankee Independent Spent Fuel Storage Installation, Exemption-Staff Evaluation (08/14/2012)
    Full Title:
    Maine Yankee Atomic Power Company, Maine Yankee Independent Spent Fuel Storage Installation, Exemption-Staff Evaluation
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, August 14, 2012
    Type:
    Notice
  • 77 FR 48565: Maine Yankee Atomic Power Company, Maine Yankee Independent Spent Fuel Storage Installation, Exemption-Staff Evaluation (08/14/2012)
    Full Title:
    Maine Yankee Atomic Power Company, Maine Yankee Independent Spent Fuel Storage Installation, Exemption-Staff Evaluation
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Tuesday, August 14, 2012
    Type:
    Notice
  • 77 FR 60482: Yankee Atomic Electric Company; Yankee Rowe Independent Spent Fuel Storage Installation, Staff Evaluation; Exemption (10/03/2012)
    Full Title:
    Yankee Atomic Electric Company; Yankee Rowe Independent Spent Fuel Storage Installation, Staff Evaluation; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, October 03, 2012
    Type:
    Notice
  • 77 FR 60482: Yankee Atomic Electric Company; Yankee Rowe Independent Spent Fuel Storage Installation, Staff Evaluation; Exemption (10/03/2012)
    Full Title:
    Yankee Atomic Electric Company; Yankee Rowe Independent Spent Fuel Storage Installation, Staff Evaluation; Exemption
    Agency:
    Nuclear Regulatory Commission
    Date Entered:
    Wednesday, October 03, 2012
    Type:
    Notice

Loading most recent entriesloading

Feedback